Materials & quality

Quality becomes dependable when it is specified.

The supplied residential specification gives a useful material baseline. The exact brands, grades, allowances and maintenance terms for a new project must be confirmed in its own quotation and agreement.

Completed residential kitchen with coordinated cabinetry and finishes
Documented material categories

A practical baseline for a residential build.

These groups summarize the supplied 2025 residential quotation. They are not presented as automatic inclusions in every Sharada Constructions project.

Structure

Specified grades and established structural material brands.

  • M25 concrete for footings, columns, plinth beams and slabs
  • M20 concrete for lintels, chajjas and lofts
  • Tata Steel, JSW Steel, Vizag Steel or A-1 Gold options
  • UltraTech cement specified
  • Concrete blocks, fly-ash bricks or laterite masonry by application

Openings & woodwork

Durable doors, windows and everyday hardware selections.

  • Teak main door and teak frame
  • Teak bedroom frames with veneer flush doors
  • Godrej locks for main and bedroom doors
  • Fiber doors for bathrooms and utility areas
  • Three-track UPVC windows with fixed ventilators

Water & finishes

Plumbing, sanitary, flooring and surface specifications.

  • Ashirvad or Finolex CPVC and UPVC
  • Jaquar or Parryware sanitaryware
  • Jaquar Florentine CP fittings
  • AGL flooring and wall tiles within the agreed specification
  • Asian Paints interior and weather-protection systems

Electrical & protection

Safety-minded electrical and preventive provisions.

  • V-Guard, RR Cables or Finolex copper wiring
  • Anchor, Legrand or GM switches and protection devices
  • MCBs, ELCB and chemical earth pits
  • Foundation and finishing-stage pest-control treatment
  • One-year maintenance period included in the supplied specification
From document to site

Four useful quality conversations.

A material list is only the beginning. Clear approvals and appropriate stage reviews help translate the written specification into completed work.

01

Specify

Record the agreed grade, brand range or performance expectation before procurement.

02

Coordinate

Check how structural, service and finishing decisions affect one another before installation.

03

Review

Use appropriate stage checks before dependent work conceals or builds over completed work.

04

Document

Confirm approved substitutions and material changes in the project record rather than relying on assumption.

Important project note

Final specifications belong with the signed scope.

The source document is a cost-quotation specification prepared for a particular residential client. Items such as tile allowances, kitchen granite thickness, available brands and one-year maintenance coverage should be reconfirmed for every new project.

Any approved substitution should state what changes, why it changes and whether it affects price, performance or programme.

Discuss the right specification

Make material expectations clear before construction begins.

Bring your plan, priorities and budget context to the first discussion so the applicable specification can be prepared around the actual project.

WhatsApp